Norr Systems has successfully completed delivery of the equipment package to BP Angola PSVM FPSO. The equipment package includes Hydraulic Power Unit (HPU), Unit Control Panel, Valves, Actuators, Deck boxes and ESD System. Factory Acceptance Test (FAT) and delivery started last quarter of 2009 and ended July of the present year.
It can be noted that Norr Systems was awarded with the contract for supply of Hydraulic Valve Remote Control System by MODEC Offshore Production Systems. Norr Systems has successfully delivered several systems and services to MODEC before and they have been one of the major customers of the company. Success for repeated contracts can be attributed to the company’s reliable systems design, highly dedicated and technically-equipped engineers.
MODEC has been awarded with Frame Agreement from BP for the supply of FPSO under EPCI Contract for the PSVM (Plutão, Saturno, Vênus and Marte) Development in Block 31 Offshore Angola. The project is a hub field development and has been under construction since 2008. The FPSO will have production capacity of 157,000 barrels per day and a storage capacity of 1,600,000 barrels of oil. The FPSO is designed to operate for 20 years without dry-docking and its first oil from the development is scheduled in 2011.